日本久久不卡视频,偷拍久久国内视频,在线观看日批视频网站,日本有码视频导航

Founded in 1994
It is a wholly-owned enterprise of Thailand CP Group
Serving the life of science and
technology civilization.

Serving the life of science and
technology civilization.

Serving the life of science and
technology civilization.

Over the past 30 years, more than 400 projects have been completed in 28 provinces, municipalities and autonomous regions across the country

News
NEWS
News Company News
News

quality and quantity guaranteed, progress guaranteed and delivery hurried all the time

Date: 2022-10-24    2936 Times


"Epidemic" constantly | implement epidemic prevention measures to ensure project progress


Foundation setting out, binding floor reinforcement, pouring concrete floor Transportation vehicles shuttle back and forth on the construction site, and the construction personnel are busy working, which is a true portrayal of the construction front line of Shanghai Zhengcheng Shaanxi Chengcheng project under the epidemic situation. At present, Shanghai Zhengcheng has strictly implemented various epidemic prevention measures, steadily promoted the prevention and control work under the normalization of epidemic situation, and spared no effort to ensure the project quality and construction progress.

1.jpg 

EPC project overview:

Chengcheng million live pigs whole industry chain project is a key project to promote the supply side structural reform of regional agriculture and animal husbandry in Shaanxi. Among them, eight 11200 head fattening farms in Chengcheng Zhengde are all EPC contracted by Shanghai Zhengcheng electromechanical Manufacturing Co., Ltd. Shanghai Zhengcheng knows that the perfect delivery of the project will provide a strong guarantee for the consumer demand for safe and high-quality meat food in Shaanxi Province and even the national market.

2.jpg 

Shanghai Zhengcheng always adheres to the tenet of "integrity-based and sincere service", strictly controls the project quality and carries out on-site fine management. At present, four of the eight 11200 head fattening farms in Chengcheng Zhengde have been perfectly delivered according to the original plan, and the other three fattening farms have successfully passed the pre acceptance. As of the day before, seven supporting farms in Zhengde are under construction as planned.

Strictly prevent and resolutely implement epidemic prevention and control:

Zhengde supporting No. 7 project was officially started on March 1 this year. At present, the infrastructure construction has been completed and the laying of fecal leakage plates in the house is under way. Under the current epidemic situation, Shanghai Zhengcheng, in accordance with the relevant local epidemic prevention requirements, strengthened the main responsibility for epidemic prevention and control, implemented epidemic prevention and control measures according to law and regulations, and ensured the safe and orderly construction of the project.

 3.jpg

The Shanghai Zhengcheng project team has established an effective joint defense communication mechanism with relevant local departments to form a perfect epidemic control and emergency plan system. Measure and register the temperature of all personnel on site twice a day, and take emergency measures such as isolation in case of any abnormal person. At the same time, the office area, dormitory area, canteen and other areas shall be fully disinfected at least once a day.

In addition, in the construction work of normalization of epidemic situation, Shanghai Zhengcheng also focused on improving the living conditions of construction personnel, reasonably arranging construction time and avoiding fatigue work. At the same time, double code (health code, travel code) plus nucleic acid report registration shall be carried out for returning personnel, vehicles and all materials. In order to prohibit personnel from medium and high-risk areas from entering the construction site, a more strict guard and patrol system has been set up at the construction site.

Strengthen organization and arrangement to ensure orderly progress of the project

In order to ensure that all work under the epidemic situation is "epidemic", the Shanghai Zhengcheng engineering management team gives full play to the advantages of the project site, makes a detailed construction plan and schedule in advance, controls the node construction period of all work, especially the key node construction period, and makes all processes seamless, coordinated and unified; Prepare sufficient turnover materials, reasonably allocate construction forces and machinery, and avoid downtime due to materials and machinery; Formulate material supply guarantee measures, quality inspection and control measures, and take precautions for all works, which not only saves time, but also improves efficiency and ensures the quality and progress of the project.


The organization, management and coordination of the project are the difficulties of project management. In this regard, Shanghai Zhengcheng gives full play to the experience of construction management internally under the condition of fully controlling the construction site, regularly holds project regular meetings, coordinates the relationship between the construction personnel of various disciplines, and organizes the construction reasonably and efficiently; Establish a coordination group externally, actively communicate with the owner, the supervision unit and other cooperative units as well as the surrounding environment, ensure that the channel to solve the on-site problems is unimpeded, and strive to steadily and orderly promote the project and achieve perfect delivery as soon as possible.


 


Company
Spirit
Pursuing Excellence and
Challenging the Limits

Copyright ? 1994-2021  Shanghai Zhengcheng electromechanical Manufacturing Co., Ltd   Technical support:SHICHUANG

CONTACT US
021-57782865
No. 3-5, Rongxing Road, Rongbei Industrial Zone, Songjiang District, Shanghai

Copyright ? 1994-2021  Shanghai Zhengcheng electromechanical Manufacturing Co., Ltd   Technical support:SHICHUANG